Meadway SEN School

The project specification was not available. From Scratch we created a complicated control interface.

 

The school had 3 floor of underfloor heating zones and window and blind control.Also on the site were a ground source heating circuit and heat pump system providing heat and cool to the schools underfloor system. Diverting valves modulated in a cooling demand to allow a boiler controlled flow to provide heating to the swimming pool AHU and pool heat exchanger. All these facets were sucessfully integrated into the schematics and clear concise control was available for satff and maintenance team.

 

For further information please do not hesitate to contact us.